DKND ENGINEERS ltd
dknd.gr

CIVIL ENGINEERS
ENVIRONMENTAL PLANNING
ROAD SAFETY EXPERTS
CONSULTANTS

ibanez

2009011407994_146046222_type12128.jpgPHNEIOS_1.jpg

Egnatia Odos Motorway" section 50.3 Florina - Niki

Opened to traffic.


1n.jpgtel.jpgaracthos3.jpg000.jpg

Egnatia Odos Motorway" sect 60 "Thessaloniki - Promachonas"

Total Highway opened to traffic

Larisa city Ring Road 


N. Potidaia – Kassandria  Highway - Kassandria's roundabout

UNDER CONSTRUCTION

Nat. Road Veria – Naousa

Patrida - Naousa section




COMPLETED

Sewerage, Stormwater and Wastewater Studies of the holiday second home village in the coastal zone of the Municipal Community of Korinos, Municipality of Katerini -  Consulting services. 

The project includes the following studies:

1. Update of Topographic Elevation Diagrams

2. Final Design of Stormwater Drainage Water Network.

3. Definitive Network wastewater studies.

4. Preliminary and Final Design of pumping stations Impure (structural and EM)

for servicing the network above and to bring wastewater to WWTP Korinou.

5. Geotechnical Foundation Design of Sewage pumping stations Impure.


OLYMPIADA_KORINOY_2000.jpgEOAE 60.1.2

HELLASCO

HELLASCO

Member of:



Associated Member of:

20160125_123029.jpg9-1-2016_10-17-09_.jpgLARISA_TOTAL_2A_2016.jpg

Florina -Interchange video


LINKED3N.jpg

Thessaloniki - Kilkis - Doirani Highway - Consulting services

a) from Assiros to Nea Santa. Implementation studies, road safety studies for 12,5 km of the highway construction.

New design of 3 interchanges and more than 25 km of service roads, with more than 8 overpasses. All the necessary during construction, temporary transportation regulations also provided. 

b) Mavroneri interchange - Kilkis city entrance

Implementation studies, road safety study studies

for 5,2km of the suburban highway construction, 

with an interchange and more than 12km of service

urban roads. All the necessary during construction, 

temporary transportation regulations also provided. 



CHALKIDONA_2013_A.jpg

Stormwater - Wastewater collection Network & Treatment Plant construction of Nea Chalkidona

Population served : 11.650 inhabitants.

Larisa city Ring Road  
hellastron.jpg

N. Moudania - N. Potidaia

Total Highway of 4,2km opened to traffic


h_2.jpg2017_N_KASSANDRIA_ROUNDABOUT.jpg

Thessaloniki's Ring Road (DESPER) - Consulting services

Implementation studies, road safety and marking study, consulting services for 3,4 km of the highway construction with 3 suburban interchanges and more than 8 km of service roads. All the necessary during construction, temporary transportation regulations also provided.